P
resentations from the 2009 Western Bridge Engineers' Seminar
2A Segmental Concrete Bridges in California
2B Concrete Durability and Sustainability
2C Earth Retaining Systems
2D Seismic Retrofit of Steel Bridges
3A Rapid Bridge Replacement
3B Precast Post-tensioned Girder Applications
3C Project Planning
3D Steel Bridge Topics
4A Case Studies from Washington State
4B Material Technology
4C Unforseen Construction Challenges
4D LRFD Seismic Design Considerations
5A Implementation of Accelerated Bridge Construction by State DOTs
5B Seismic Analysis of Bridge Substructures
5C Context Sensitive Solutions for Pedestrian Bridges
5D Case Studies Outside of the Western States
6A LRFD General Design Considerations
6B Precast Girder Design Topics
6C Foundations
6D A Slew of Case Studies from Seattle
7A Accelerated Bridge Construction Projects
7B Innovative Precast Design Solutions
7C Cold Weather Challenges in Bridge Construction
7D Bridge Bearings and Expansion Devices
8A Innovative Precast Girder Shapes
8B Bridge Repair and Rehabilitation
8C Innovative Bridge Inspection Techniques
8D Case Studies from Oregon
9A Case Studies from California
9B Managing the Condition of our Existing Bridges
9C Current Bridge Issues
10 General Session