- The Design and Construction of Medium Span HPS Hybrid Box Girder Bridges Over I-5 Mainline Traffic
Loung (Lou) H. Tran, P.E., Washington State DOT, Olympia, WA
- Bridge and Structures Best Practices and Lessons Learned for a Successful Design/Build Project: I-405 South Bellevue Case Studey
Stuart Bennion, P.E., S.E., Wasington State DOT, Olympia, WA
Jim Schettler, P.E., S.E., Jacobs Engineering, Bellevue, WA
Mark Silverman, P.E., Atkison Construction, WA
- Design of the 4th Avenue Off-Ramp of the Eastbound South Spokane Street Viaduct in Seattle [mpg]
Barbara S. Moffet, P.E., Jacobs Engineer, Inc., Seattle, WA
Kent T. Ferguson, P.E., S.E., Jacobs Engineer, Inc., Seattle, WA
Kevin T. Dusenberry, P.E., S.E., Jacobs Engineer, Inc., Seattle, WA<
|