Presentations from the 2015 Western Bridge Engineers' Seminar
- Keynote Speakers
- 2A Accelerated Bridge Construction
- 2B Brigde Foundation Seismic Design
- 2C Bridge Design Considerations
- 2D Bridge Rehabilitation
- 3A Accelerated Bridge Construction
- 3B Bridge Design and Construction
- 3C Bridge Construction
- 3D Bridge Rehabilitation
- 4A Accelerated Bridge Construction
- 4B Bridge Durability and Materials
- 4C Bridge Construction
- 4D Bridge Rehabilitation and Replacement
- 5A Accelerated Bridge Construction
- 5B Bridge Research and Analysis
- 5C Foundation Design and Construction
- 5D Bridge Materials and Maintenance
- Specialized Post-Tensioning Inspection and Repair
Travis Green, Wiss, Janney, Elstner Associates, Inc.
Eric Anderson, Wiss, Janney, Elstner Associates, Inc.
- Bridge Materials and Methods
Hormoz Seradj, Oregon Department of Transportation
- Development of National Training for Bridge Maintenance
Eric Thorkildsen, Greenman-Pedersen, Inc.
- 6A Bridge Design and Construction
- 6B Bridge Design and Construction
- 6C Bridge Materials and Details
- 6D Inventory and Maintenance
- 7A Bridge Seismic Design
- 7B Bridge Designs and Scour Challenges
- 7C Bridge Seismic Design
- 7D Instrumentation and Inspection
- 8A Bridge Joints and Bearings
- 8B Rail and Retaining Structures
- 8C Bridge Seismic Design
- 8D Load Rating
- 9A Bridge Design and Construction
- 9B Bridge Analysis
- 9C Bridge Design and Construction
- 9D Bridge Inspection
|